What is the method of adding refrigerant to air cooled water chiller system?

Industry News 6550

  What is the method of adding refrigerant to air cooled water chiller system?

  Addition of refrigerant

  During the use of air-cooled chillers, there may be insufficient or missing refrigerant due to various reasons (such as refrigerant leakage, maintenance, etc.). To ensure the normal operation of the air-cooled chiller unit, it is necessary to add refrigerant. The following is the method of adding refrigerant:

  1. Safety inspection

  Before adding refrigerant, it is important to conduct a safety check on the entire system. Firstly, check for cracks, leaks, etc. After inspection, determine the amount of refrigerant to be added based on the type of refrigerant used.

  2. Material preparation

  After determining the amount of refrigerant to be added, materials such as refrigerant, brass valves, and valve gaskets need to be prepared. Usually, refrigerants are sold in bottles or barrels, and it is necessary to confirm that the purchased refrigerant is the same model as the air cooled chiller you are using.

  3. System emptying

  Before adding refrigerant, it is necessary to evacuate the air and water in the system. This process can be achieved by connecting a vacuum pump, forced exhaust, and other means.

  4. Add refrigerant

  When adding refrigerant, it is necessary to first turn off the power supply of the air-cooled chiller, and then connect the refrigerant to the corresponding pipeline of the chiller. Usually, refrigerant is injected through two ports, high-pressure and low-pressure, and it needs to be connected correctly according to the pipeline connection method of the chiller. When adding refrigerant, it is necessary to gradually inject it to ensure that each addition of refrigerant only occupies 10-20% of the total amount of refrigerant in the cold water machine.

  5. Inspection

  After adding refrigerant, restart the air-cooled chiller after a period of time, and check it after 15 minutes of operation to confirm whether the system operates normally.

The prev: The next:

Related recommendations

  • chillers capacity

    158

    Chiller Capacity: A Fundamental Aspect of Industrial Cooling Systems Chiller capacity is a critical parameter in the design and operation of industrial cooling systems. It defines the cooling o...

    View details
  • temperature for cooling

    156

    Introduction to Temperature for Cooling The concept of "temperature for cooling" is fundamental in ensuring human comfort, maintaining the quality of perishable goods, and optimizing industrial...

    View details
  • temp chamber

    127

    Temperature chambers, often referred to as thermal chambers, are specialized enclosures designed to create controlled thermal environments. These chambers enable precise temperature simulations ra...

    View details
  • industrial heat transfer

    155

    Introduction to Industrial Heat Transfer Industrial heat transfer is a vital component in the field of engineering, playing a significant role in the efficiency and performance of numerous syst...

    View details
Click Cancel to reply
    Expand more!
    1
    Leave a message